Flow control valves solve temperature problem

Introduction

Our client, an OEM (original equipment manufacturer) is based in the UK and provide manufactured parts to  projects throughout the world.

 

The Problem

We were initially approached by our client due to an issue they were experiencing with system temperature and flow on their equipment.

The problem was causing an increased rate of cooling time which in turn was intensifying the warping of plastic products on their cooling line.

The Solution

Following a meeting with our technical staff and further investigation, our team introduced new inline flow control
valve manifolds along with new larger bore hose assemblies.

This allowed an increase flow rate to be managed which solved the temperature and flow problem.

 

Summary

The design of cooling systems is extremely important in injection moulding and the manufacture of plastics.

Due to the installation of the valve manifolds & larger bore hose assemblies, we successfully ensured our client
encountered no further problems in their manufacturing process and were able to continue with uninterrupted
supply.

 

“As not just suppliers and distributors of products, we were delighted to be able to specify, source and install the valves and hose assemblies to our client to ensure no further problems in their manufacturing process.”

Don Fenwick – HOS managing director

 

For information on how we could help your business, visit our services page https://hos.co.uk/hos20/services/ or contact us at hos@hos.co.uk

What Our Clients Say

We have worked with HOS for many years from small subsea cable ploughs to large J lay pipe installation towers, they are always willing to go above and beyond to meet our requirements & are experienced, friendly and willing to do what they can to help.

Lead Engineer – Multi National Maritime Solutions Provider

HOS offer a prompt supply service, along with technical assistance, quality is always at a high standard, we have developed an extremely good working relationship which we hope to continue to build on for future requirements.

Production Manager – National Engineering Company

We would highly recommend HOS, we receive excellent customer service, quick delivery and great product quality.

Administration & Marketing Manager – Engineering Solutions Provider

96 x 4SH hose assemblies – measured, tagged, pressure tested, flushed, installed and certified within 7-day window, Wow!

Ship Superintendent – Oil Rig Support Vessel

Thanks again for all your work on the recent project, great turn-a-round in less than a week for two complete marine hydraulic hose kits which were manufactured, pressure tested and flushed, complete with full documentation pack.

Head of Construction - International Subsea Engineering Company