Our client is a UK based manufacturing business with over 30 years experience in the offshore supply industry.

 

 

The Problem

Following the completion of a long term project, our client requested our support to decommission a heavy lift crane.

 

 

 

The Solution

Upon arrival at site, our team discovered a 120 tonne heavy lift crane that required decommissioning.

 

HOS technicians and engineers created a work schedule alongside the clients’ requirements which included:

 

  • Bracing of all related hydraulic cylinders
  • Hydraulic system drained
  • All related accumulator pressures discharged and removed from the system
  • Hydraulic motors disconnected and removed
  • Hydraulic hose assemblies and grease lines removed and blanked off

 

 

Summary

Our work ensured that all equipment was decommissioned safely and within regulations to enable our client to carry on with further projects in the area.

 

 

“This project really demonstrates that our team are not just here for smaller projects, this work scope was complicated with safety being of paramount importance, with the support of our team, the work was carried out on time and within budget.”

Don Fenwick – HOS managing director

 

For information on our decommissioning, visit our products page HERE or contact us at hos@hos.co.uk

What Our Clients Say

We have worked with HOS for many years from small subsea cable ploughs to large J lay pipe installation towers, they are always willing to go above and beyond to meet our requirements & are experienced, friendly and willing to do what they can to help.

Lead Engineer – Multi National Maritime Solutions Provider

HOS offer a prompt supply service, along with technical assistance, quality is always at a high standard, we have developed an extremely good working relationship which we hope to continue to build on for future requirements.

Production Manager – National Engineering Company

We would highly recommend HOS, we receive excellent customer service, quick delivery and great product quality.

Administration & Marketing Manager – Engineering Solutions Provider

96 x 4SH hose assemblies – measured, tagged, pressure tested, flushed, installed and certified within 7-day window, Wow!

Ship Superintendent – Oil Rig Support Vessel

Thanks again for all your work on the recent project, great turn-a-round in less than a week for two complete marine hydraulic hose kits which were manufactured, pressure tested and flushed, complete with full documentation pack.

Head of Construction - International Subsea Engineering Company