News

DNV to study safety risks on world’s first offshore renewable hydrogen facility

DNV will lead the process safety study to identify the main environmental, safety and operational risks for the world’s first offshore green hydrogen production facility, which will be put into operation next year in France.

 

The risks DNV will be investigating include the floating barge, fuel cells and hydrogen production. A regulations and standards review will also be included as part of the study.

 

“This is potentially a watershed project, one we are excited to be supporting during the FEED stage. Proving the safety of such activities, particularly with new technologies, to gain acceptance and move them closer to adoption, is vital for the industry and stakeholders”, said Santiago Blanco, Executive Vice-President and Regional Director Southern Europe, MEA and LATAM, Energy Systems at DNV.

 

The project will be set up by French renewable hydrogen project developer Lhyfe, and the French engineering and research centre Centrale Nantes, in collaboration with Chantiers de l’Atlantique, who will install the electrolyser on GEPS Techno’s floating platform at the SEM-REV site and connect it to various marine renewable energy sources, including the Floatgen floating wind turbine.

 

Along with the first offshore green hydrogen facility, Lhyfe and Chantiers de l’Atlantique are said to be working on a detailed design for an offshore hydrogen production platform with a capacity ranging from ten to several hundred megawatts, which could be built in Saint-Nazaire as early as 2024.

 

Source: Offshore Energy

What Our Clients Say

We have worked with HOS for many years from small subsea cable ploughs to large J lay pipe installation towers, they are always willing to go above and beyond to meet our requirements & are experienced, friendly and willing to do what they can to help.

Lead Engineer – Multi National Maritime Solutions Provider

HOS offer a prompt supply service, along with technical assistance, quality is always at a high standard, we have developed an extremely good working relationship which we hope to continue to build on for future requirements.

Production Manager – National Engineering Company

We would highly recommend HOS, we receive excellent customer service, quick delivery and great product quality.

Administration & Marketing Manager – Engineering Solutions Provider

96 x 4SH hose assemblies – measured, tagged, pressure tested, flushed, installed and certified within 7-day window, Wow!

Ship Superintendent – Oil Rig Support Vessel

Thanks again for all your work on the recent project, great turn-a-round in less than a week for two complete marine hydraulic hose kits which were manufactured, pressure tested and flushed, complete with full documentation pack.

Head of Construction - International Subsea Engineering Company