How to reduce unplanned downtime

When managing a plant, downtime is inevitable, it could be caused by a malfunction or simply planned maintenance but whatever the reason, it costs you money.  Unplanned downtime costs you much more, this could be as a result of a broken part for example – you will need to take time to identify the problem, fix it and then make sure there aren’t any ancillary problems before you restart.

 

In our latest blog, we’re here to provide guidance on how to restrict your downtime to a minimum.

 

  1. Undertake a risk audit

Now, we know this may not sound too interesting but it’s the most effective and fastest step you can take to reduce downtime in the future.

Obsolete equipment can pose a significant risk to operations, despite advancements in equipment, a great number of manufacturers still work with equipment that is 15-20 years old.  Parts often become unavailable or can only be sourced outside of the country and take weeks to deliver.

 

  1. Calculate the cost of your downtime

Not calculating the true cost of your downtime is one of the biggest errors you can make, five minutes here and there quickly adds up.

The true downtime cost includes loss in staff productivity, loss in production of actual goods, number of man-hours devoted to rescheduling, costs of repairing equipment and possible damage to your reputation.

 

  1. Have a proactive and not a reactive approach

Preventative maintenance can reduce unplanned downtime tremendously, which is why it should already be a part of your plant’s routine. However, many plant operators don’t know that the equipment manufacturer recommendations are often either too liberal or too conservative when it comes to planned maintenance intervals.

 

  1. Train your employees

Operator error is the second most common cause of downtime after hardware error. A good operator will not only diagnose and fix their own machine, but have the ability to prevent future downtime events through maintenance schedules and accurate documentation.

 

  1. Stick to a preventative maintenance schedule

Equipment can’t last forever, but a sound maintenance schedule will increase its life.  Maintenance reduces the probability of failure and downtime, increases overall equipment effectiveness, improves safety and increases productivity.

 

  1. Create a maintenance checklist

Mitigating unplanned downtime is a job that’s never going to end. You will never run out of refinements and upgrades to make to your procedures, but continuing to refine your process will ultimately give you an advantage over your competition.

Understanding proper equipment maintenance is a great place to start.

 

Read how we helped a customer with their recent planned shutdown maintenance, saving them time in lost production: https://hos.co.uk/hos20/planned-shutdown-maintenance-saves-customer-costs-and-downtime/

 

If you’re looking at preventative maintenance during factory shutdown periods, contact us about how we can help: hos@hos.co.uk

What Our Clients Say

We have worked with HOS for many years from small subsea cable ploughs to large J lay pipe installation towers, they are always willing to go above and beyond to meet our requirements & are experienced, friendly and willing to do what they can to help.

Lead Engineer – Multi National Maritime Solutions Provider

HOS offer a prompt supply service, along with technical assistance, quality is always at a high standard, we have developed an extremely good working relationship which we hope to continue to build on for future requirements.

Production Manager – National Engineering Company

We would highly recommend HOS, we receive excellent customer service, quick delivery and great product quality.

Administration & Marketing Manager – Engineering Solutions Provider

96 x 4SH hose assemblies – measured, tagged, pressure tested, flushed, installed and certified within 7-day window, Wow!

Ship Superintendent – Oil Rig Support Vessel

Thanks again for all your work on the recent project, great turn-a-round in less than a week for two complete marine hydraulic hose kits which were manufactured, pressure tested and flushed, complete with full documentation pack.

Head of Construction - International Subsea Engineering Company